Skip to content

Diagrams

Search Folto

Common diagrams can be placed with a skeleton as a diagram.

DiagramHow it works
FlowchartConnect steps and decisions with lines. Add the next step with + or Tab and it lines up along the flow.
SwimlanePlace cards in a grid of owners (lanes) × stages. Move a card to another cell to reclassify it.
TreeA hierarchy of parents and children. Add a child with + or Tab, a sibling with the + on the right.
TimelineLay out events by point in time. Add one with the + on a point.
ER DiagramTables, columns, and relationships between columns. Double-click a row to edit; ↩ adds a column.
  1. Click Diagram (M) in the toolbar and pick a type
  2. Click the board to place it with a skeleton (drag to set the size)
  • Select an item and click + or press ⇥ (Tab) to add the next item or a child
  • In a tree, the + on the right adds a sibling
  • In swimlanes and timelines, the + on a cell or time point adds a row, column, or time point. Moving an item to another cell changes its category
  • To tidy a flowchart or tree, select it and choose Arrange › Arrange as Flowchart or Arrange as Tree

Draw the shape of your data with tables, columns, and relationships.

  • Double-click a row in a table to type the column name and type. ↩ moves to the next column; ⌫ on an empty row deletes it
  • Set primary and foreign keys in the key column. A ? after the type means the column can be null
  • Drag from the end of a column to a column in another table to add a relationship. Select the line to choose the cardinality at each end (exactly one, zero or one, one or many, zero or many)
  • Paste SQL CREATE TABLE statements onto the board to build an ER diagram
  • Select tables to Copy as SQL or Copy as Mermaid