Quick starts
Pick a card (quick start) in the right panel and Folto AI starts with a request tailored to that task. Cards are chosen to fit what’s in the open project (code, documents, and so on). All Quick Starts shows every one.
Picking a card adds a chip to the field. Add details and send, or just send.
All quick starts
Section titled “All quick starts”Development
- Draw the project’s architecture: Reads the project and draws its parts, grouped by role, and how they depend on each other.
- Draw a dependency graph: Connects modules to what they use.
- Draw the database structure: Draws tables or models and the relationships between them.
- Draw screens and navigation: Draws the screens and how you move between them.
- List the UI components: Lists the components that make up the screens, by kind.
- Draw a process flow: Draws the order in which a feature runs, as a flow.
- Map the impact of a change: Lays out the current state, the changed state, and what’s affected.
- Organize requirements: Groups the requirements and features of what you’re building.
Design
- Design a service blueprint: Lays out customer actions and the front- and back-stage systems behind them, stage by stage.
- Draw a customer journey: Lays out what users do, think, feel, and struggle with, stage by stage.
- Build a user story map: Arranges features along user activities, in priority rows.
- Draw a site map: Draws the page hierarchy and links, from the top page down.
- Design a system architecture: Designs the parts of a system and how they connect.
Research
- Sort out the points in documents: Reads the documents and separates open questions, decisions, and what’s still undecided.
- Organize research questions and progress: Lays out questions, hypotheses, tests, and findings, stage by stage.
- Compare sources and prior work: Lists your sources with the question, method, findings, and relevance of each.
- Form questions and hypotheses: From a topic, lays out questions, hypotheses, how to test them, and what you need.
- Build an argument: Arranges evidence, counterarguments, and sources around your main point.
- Organize experiment and analysis notes: Lays out experiments and analyses as conditions, steps, results, and insights.
- Outline a piece of writing: Outlines a report, paper, or article with what each section says and its material.
- Map the terminology: Draws the terms used in this project, what they mean, and how they relate.
Thinking & relationships
- Group and sort notes: Groups scattered notes by theme and shows what they say and what’s missing.
- Draw a concept map: Draws the concepts you’re thinking about and how they relate.
- Map the stakeholders: Draws the people and organizations involved and how they interact.
- Draw a mind map: Branches out related ideas from a central theme.
- Analyze problems and causes: Digs into the causes of a problem by asking why, repeatedly.
- List the issues: Groups the issues worth thinking about for a topic.
Planning & retrospectives
- Pull decisions and to-dos from meeting notes: Separates decisions, action items, and open topics from meeting notes.
- Draw a roadmap: Lays out what to do as a plan over time.
- Break down the work: Breaks a goal into small tasks.
- Make a Kanban board: Adds To Do, Doing, and Done columns and drafts cards from the project’s TODOs.
- Run a KPT retrospective: Adds Keep, Problem, and Try columns and drafts from recent records.
- Identify risks: Arranges possible problems by impact and likelihood.
- Record decisions: Records decisions, their reasons, and the options not chosen, from boards and documents.